top of page
The SectorScope website heading Test 1.png

Datum opens sustainable MCR2 data centre in Manchester

Datum Data Centres opened its sustainable MCR2 facility in Manchester in July. 

2 July 2025

Datum Data Centres opened its MCR2 facility in Manchester in July. MCR2 will take a central role in Manchester’s growing technology economy, providing enterprise-grade data centre capabilities.


The construction of MCR2 has been part of the regeneration of Wythenshawe, which will benefit from investment of £500 million over the next decade. Datum said that its decision to build a second facility in Manchester was driven by the region’s continually growing need for high-quality, purpose-built data centre facilities.


MCR2 is designed with underlying sustainability principles, which included an embodied carbon assessment at design stage. The centre is powered entirely by sustainable energy sources and includes a solar PV roof and emergency generators that run on HVO biofuels. By incorporating energy-efficient systems, MCR2 helps tenants and their clients meet ESG targets. 


The MCR2 building also includes heat reuse capability. It is designed to transfer excess heat from the cooling system to a nearby local heat network – potentially heating 700 to 1,500 homes planned 20 metres from the site.

THIS WEEK'S TOP NEWS STORIES

Industry bodies launch drive to push clients on Building Safety Act compliance

Industry bodies launch drive to push clients on Building Safety Act compliance

Go
Kier appointed to deliver new state-of-the-art Eye Hospital at Edinburgh BioQuarter

Kier appointed to deliver new state-of-the-art Eye Hospital at Edinburgh BioQuarter

Go
Royal London AM and Graftongate plan £140m Fareham logistics scheme

Royal London AM and Graftongate plan £140m Fareham logistics scheme

Go
City of London showcases future skyline as planning pipeline gathers pace

City of London showcases future skyline as planning pipeline gathers pace

Go
 Studio Egret West leads Battersea Power Station final masterplan

Studio Egret West leads Battersea Power Station final masterplan

Go
Bradford City Village regeneration scheme secures planning approval

Bradford City Village regeneration scheme secures planning approval

Go

FOLLOW THE SECTORSCOPE

  • Instagram
  • X
  • Linkedin
  • Youtube
bottom of page